論文投稿 INVESTIGATION OF DAM FOUNDATION GROUTING PROCESS

作成年度 2006 年度
論文名 INVESTIGATION OF DAM FOUNDATION GROUTING PROCESS
論文名(和訳)
論文副題
発表会
誌名 Proceedings of 4th Asian Rock Mechanics Symposium
巻・号・回 -
発表年月日 2006/11/01
所属研究室/機関名 著者名(英名)
水工研究グループダム構造物チームHiroyuki SATOH、Yoshikazu YAMAGUCHI、Tomohiko ABE
抄録
"In dam rock foundations, grouting is performed to improve water-tightness and reinforce weak parts. It is difficult to accurately estimate the improvements brought about by grouting, because the grouting is applied in the rock mass where it is not visible. Recently, research on optimum grout mixtures has advanced and a system that can automatically change the grout mix proportion has been developed. It is possible to change the grouting specifications in order to shorten the injection duration time, if the injection process can be predicted from early grout injection process data. In this paper, we propose a mathematical model, which expresses the injection process of the grouting. Then, we predict the injection duration time and quantity, etc., from early injection process data of the consolidation grouting of an existing dam, using the proposed model and examine the validity of the model."
ページの先頭へ

この画面を閉じる

Copyright (C) 2022 Independent Administrative Institution Public Works Research Institute