| "From the reason on demands for preservation of the natural environment and reduction of the public prpJect's cost,the efficient utiilization of existing dams has advanced recently ln Japan.When an additional conduit is built in the existing concrete dam as renewwal project,the stress distribution around the conduit,Which installed in the existimg dam body,is different from that in the newly constructed dam.In this paper,the stress distribution is evaluated in detail bv the 3D-FEM analys inconsideration of the renewal work process,and the effectiveness of re-bars is considered.Theinfluence of large earthquake is also considered,One method for the determination of amount of re-bars is suggested.In addition,the current situation regarding the renewal projects for existing concrete dams in Japan are introduced briefy" |