発表 Performance Requirement of Immediate Ring Closure Method for Difficult Ground Conditions in Conventional Tunneling

作成年度 2016 年度
論文名 Performance Requirement of Immediate Ring Closure Method for Difficult Ground Conditions in Conventional Tunneling
論文名(和訳)
論文副題
発表会 ITA WTC 2016
誌名 Proceedings of ITA-AITES World Tunnel Congress 2016
巻・号・回 4 414
発表年月日 2016/04/22 ~ 2016/04/28
所属研究室/機関名 著者名(英名)
Shimizu Co.Dohta Awaji
トンネルチームNobuharu Isago
トンネルチームAtsushi Kusaka
Oriental Consultants Co.Kosuke Kawata
抄録
The immediate ring closure method, in which the entire periphery of the excavation area is closed immediately with an initial support within a short distance from the excavation face, has been increasingly used in Japan, especially, as one of the most effective countermeasures against difficult ground conditions in conventional tunneling. For reasonable design of this method, the performance requirements for the initial support should be clearly stated. The analysis of construction data of 30 road tunnels and the three-dimensional numerical modeling based on real data suggest that the immediate ring closure stabilizes the tunnel structure and the ground around it because of the inner pressure effect of the initial support, especially, for low ground competence factor and small internal friction angle. Finally, the bending compressive strength and the cross-sectional geometry of the initial support have to be considered in the tunnel design while considering the earth pressure and ground properties.