国立研究開発法人土木研究所

論文・刊行物検索

利用者の方へ

詳細情報

発表 Long-term durability of permanent lining concrete in mountain tunnel

作成年度 2017 年度
論文名 Long-term durability of permanent lining concrete in mountain tunnel
論文名(和訳)
論文副題
発表会 ITA-AITES World Tunnel Congress 2017
誌名 ITA-AITES World Tunnel Congress 2017 Proceedings
巻・号・回 6 14743
発表年月日 2017/06/09 ~ 2017/06/15
所属研究室/機関名 著者名(英名)
Tunnel teamNobuharu ISAGO
Tunnel teamToshiaki ISHIMURA
Tunnel teamSatoshi Morimoto
抄録
Up-close visual inspection has been mandatory and hammer strike test is done as necessary in periodical inspection for all road tunnels in Japan from 2014. Information obtained by inspections should be accurately evaluated in order to diagnose the soundness of tunnel and select proper countermeasures correctly. Defect and deformation mechanisms of the permanent lining of mountain tunnels, such as crack occurrence and development, have not entirely been clarified, and the delamination and spalling of concrete, harming tunnel users, sometimes occurs. Data related to the crack width and stress change of permanent lining were gathered over 10 years and its long-term behavior and durability are discussed. The results provide insights needed to set frequency and methodology of periodical tunnel inspection through the basic behavior of lining, including the cracks over concrete.
ページの先頭へ

この画面を閉じる

Copyright (C) 2022 Independent Administrative Institution Public Works Research Institute